Kakamas Hydro Power Services

Production monitoring and maintenance management

Production
10300 kW
Curtailment
None
Turbines Online
3 / 3
Canal Flow
92,7 (est) m³/s
Station Status
Operational
Feed: Live
Unit 1
3400 kW
Online Generating
Unit 2
3430 kW
Online Generating
Unit 3
3470 kW
Online Generating
Sump Leakage
Pump time · last 24 h
56,3 min/day 8%

7-day average 52,3 min/day
Latest cycle 57,1 min/day

Time to damage 11h 28m
Water Levels
Forebay Level 674,48 m
Tail Race Level 659,00 m
Turbine Head 15,47 m
Weir Level 675,03 m
Weir Spill 0 kW
601 mm over the 674,43 m setpoint. Enough is going past to run the station to its 10 000 kW capacity, against 10 300 kW being generated.
Canal Flow 92,7 (est) m³/s

Live · last updated 16 Sep 2026 12:09 (3m 22s ago)