Kakamas Hydro Power Services
Production monitoring and maintenance management
Live
Plant data is current — the last sample arrived 3m 22s ago.
4 breaks in the record over the last
14 days —
about 28 samples
(2h 20m) never arrived.
Record is 99,3 % complete.
Production
10300 kW
Curtailment
None
Turbines Online
3 / 3
Canal Flow
92,7 (est) m³/s
Station Status
Operational
Feed: Live
Unit 1
3400 kW
Online
Generating
Unit 2
3430 kW
Online
Generating
Unit 3
3470 kW
Online
Generating
Sump Leakage
Pump time · last 24 h
56,3
min/day
8%
7-day average
52,3 min/day
Latest cycle
57,1 min/day
Time to damage
11h 28m
Water Levels
Forebay Level
674,48 m
Tail Race Level
659,00 m
Turbine Head
15,47 m
Weir Level
675,03 m
Weir Spill
0 kW
601 mm over the
674,43 m setpoint.
Enough is going past to run the station to its
10 000 kW capacity, against
10 300 kW being generated.
Canal Flow
92,7 (est) m³/s
Live
· last updated 16 Sep 2026 12:09
(3m 22s ago)