Kakamas Hydro Power Services

Production monitoring and maintenance management

Production
0 kW
Curtailment
—
Turbines Online
0 / 3
Canal Flow
0,0 (est) m³/s
Station Status
Offline
Feed: Live
Unit 1
0 kW
Offline Stopped and Faulty
Unit 2
0 kW
Offline Stopping
Unit 3
0 kW
Offline Stopped and Faulty
Sump Leakage
Pump time · last 24 h
26,2 min/day 64%

7-day average 1,2 h/day
Latest cycle 1,3 h/day

Time to damage 1d 8h
Water Levels
Forebay Level 674,78 m
Tail Race Level 657,75 m
Turbine Head 17,03 m
Weir Level 674,83 m
Weir Spill 10 000 kW
400 mm over the 674,43 m setpoint. Enough is going past to run the station to its 10 000 kW capacity, against 0 kW being generated.
Canal Flow 0,0 (est) m³/s

Live · last updated 11 Nov 2026 11:55 (2m 19s ago)